Installation, commissioning and acceptance
Our engineers guide installation, run the plant through its tests and calibrate it with your materials before handover.
A plant is accepted when it produces the agreed mix, at the agreed rate, under agreed conditions. We guide the mechanical and electrical installation, then test the plant in stages: empty, with interlocks, and finally with your materials.
Output, weighing accuracy, mix quality and emissions are tested separately, each with its own method — not one general promise.
How we work
- 01
Installation check
Foundations, structures, cables and pipes checked against the drawings.
- 02
No-load tests
Motor directions, sequences, emergency stops and door switches.
- 03
Interlock tests
Burner safety, temperature limits and discharge gate signals.
- 04
Calibration
Aggregate, filler, bitumen and additive scales calibrated.
- 05
Trial production and acceptance
Mix produced, sampled and tested under the agreed conditions.
What HMAMIX provides
- Engineers to guide installation and commissioning
- Control program tests and scale calibration
- Trial production with your materials
- Acceptance tests to the method agreed in the contract
What you prepare
- Finished foundations and site roads
- Cranes, tools and installation crew
- Power, fuel, bitumen, aggregates and trucks for trials
- Laboratory testing of the trial mix
Questions
Do you install the plant yourselves?
Our engineers guide installation and carry out commissioning. Cranes and the installation crew are usually arranged locally; if you need us to take on installation, we agree it in the contract.
How is plant output tested?
Under agreed conditions: aggregate moisture, mix temperature, fuel and recipe. Output stated without conditions cannot be tested fairly.
Tell us about your project
Share your required capacity, site location and fuel type — our engineers will recommend a suitable plant configuration.